McKenzie Electric Logo
Home » About Us

About Us

Headquarters Building in Watford City, ND Outpost Building in Killdeer, ND

Headquarters Building in Watford City, ND

Outpost Building in Killdeer, ND

McKenzie Electric Cooperative, Inc. (MEC) is a rural electric cooperative headquartered in Watford City, North Dakota. Our service area includes all or part of five counties in North Dakota (McKenzie, Dunn, Billings, Golden Valley and Mercer Counties) and two in Montana (Richland and Wibaux Counties).

McKenzie Electric began doing business in 1945 and currently serves 2,300 member-owners by providing electrical service to more than 5,000 meters. The electric plant consists of 20 substations and 3,120 miles of distribution and transmission line. Nearly 85% of the electrical sales serve commercial and industrial customers.

The Cooperative is governed by a nine member Board of Directors who are elected by the membership they serve. Their mission has been to make reliable electric energy available at the "lowest possible cost". The Cooperative currently employees 29 full-time employees in Watford City and 2 full-time employees at the outpost in Killdeer.

McKenzie Electric joined with Oliver-Mercer Electric in Hazen, ND, and West Plains Electric in Dickinson, ND to form 3C Construction, LLP, an electrical construction company.

2005 Facts and Figures

Number of Members 2330

Number of Meters

5225

Miles of Line:

Transmission

179.34

URD

665.86

Overhead

2321.94

Meters/Mile of Line

1.7

Average KWH Rate

5.66 cents

Annual Load Factor

83.94%

Total Outages

271

Outage Time-Hour Per Meter Per Year

11.67

Cost of Line Construction:

Single Phase URD

$41,976

Three Phase URD

$48,048

Single Phase Overhead

$25,872

Three Phase Overhead

$41,184

Assets

$42,535,584

Equity

$36,604,984

RUS Net Loans Outstanding

$11,486,219

Average Interest Debt Rate

3.75%

Capital Credits Returned

$1,201,500

Total Capital Credits Returned

$13,974,602

Capital Credits Assignable

$4,287,888

DSC

4.99%

TIER

10.58%

Equity

86.06%

Taxes Paid in 2005

County

Milesof Line

TaxesPaid

McKenzie

2227.38

$239,391.81

Dunn

688.27

$79,373.07

Billings

69.70

$7,529.73

Golden Valley

89.54

$8,685.66

Mercer

0.36

$38.82

Wibaux, MT

51.27

$609.73

Richland, MT

49.62

$512.52